    NEW DELHI, SEP.23, 2015: India's Defense Research and Development Organisation (DRDO) today claimed it has successfully developed the Air Independent Propulsion (AIP) technology, which gives conventionally-powered submarines longer endurance to stay underwater.

    This was announced by the DRDO chief Dr.S.Christopher at the annual DRDO Awards function presided over by Defense Minister Manohar Parrikar and the chiefs of the Indian Navy and the Air Force.

    Dr.Christopher said the indigenously-developed AIP technology has been demonstrated on a land-based prototype. Talks are on with the French DCNS to examine the possibility of incorporating the AIP plug in the 5th and 6th Scorpene submarines being constructed at Mumbai's Mazagon Docks Limited under a technology transfer.

    The technology demonstrator has been developed by the DRDO's Naval Material Research Laboratory (NMRL) at Ambernath in Maharashtra.

    If the technology works, it'll rule out import of AIP plugs. AIP is being looked upon as a significant game changer in conventional diesel-electrical submarine operations. AIP-fitted submarines can stay underwater much longer than those without it.

    Diesel-electrical submarines have the limitation of having to surface regularly to re-charge batteries. This makes these boats vulnerable to enemy attack.

    http://www.armingindia.com/Air-Indep...es%20Ready.htm

  2. #2
    Professional PoKeMon's Avatar
    Join Date
    Jul 2012
    Posts
    3,719
    Thanks
    2386
    India India

    Re: Air-Independent Propulsion For Last Two Scorpene Submarines Ready: DRDO

    [MENTION=9415]Mohan Tiwari[/MENTION]

    Finally some good news coming from DRDO. I find it amusing that how well IN is performing with same organisation while IA and IAF always bickering.

    I have learnt that DRDO AIP has an endurance of almost 25 days, similar to french MESMA which claims more than 21 days and cost 50+ million dollars.
    The Following User Says Thank You to PoKeMon For This Useful Post: Mohan Tiwari


  3. #3
    Senior Member Mohan Tiwari's Avatar
    Join Date
    Jul 2015
    Location
    India
    Posts
    2,553
    Thanks
    586
    India India

    Re: Air-Independent Propulsion For Last Two Scorpene Submarines Ready: DRDO

    Quote Originally Posted by PoKeMon View Post
    [MENTION=9415]Mohan Tiwari[/MENTION]

    Finally some good news coming from DRDO. I find it amusing that how well IN is performing with same organisation while IA and IAF always bickering.

    I have learnt that DRDO AIP has an endurance of almost 25 days, similar to french MESMA which claims more than 21 days and cost 50+ million dollars.

    Its still in prototype stage. They have managed to demonstrate the protoype on land based device in submerged pond/lake type set up. Can they test the prototype inside sea(500 meter) under the vital characteristics of a submarine: outside & Inside Pressure,temperature, depth,

    DRDO/NRML AIP will then have to manufacture the real product. Testing,redesign and re manufacturing cycles will need atleast 3-5 years to mature. Indian navy will not clear this technology until NRML is able to meet the criteria.

  4. #4
    Professional PoKeMon's Avatar
    Join Date
    Jul 2012
    Posts
    3,719
    Thanks
    2386
    India India

    Re: Air-Independent Propulsion For Last Two Scorpene Submarines Ready: DRDO

    Quote Originally Posted by Mohan Tiwari View Post
    Its still in prototype stage. They have managed to demonstrate the protoype on land based device in submerged pond/lake type set up. Can they test the prototype inside sea(500 meter) under the vital characteristics of a submarine: outside & Inside Pressure,temperature, depth,
    You dont call a prototype to be "ready to deploy". Moreover, land based facilities are replicated as close to real time environment i.e. temperature and pressure of real time submarine are taken care of. These are primary requisite considering the metallurgy and chemicals shows varied properties based on temperature and pressure.

    DRDO/NRML AIP will then have to manufacture the real product. Testing,redesign and re manufacturing cycles will need atleast 3-5 years to mature. Indian navy will not clear this technology until NRML is able to meet the criteria.
    This is not a prototype and we do have 4 more years before 5 and 6th submarine will be rolled out. All regressive testing will happen in between.
    The Following User Says Thank You to PoKeMon For This Useful Post: Mohan Tiwari


Similar Threads

  1. Replies: 2
    Last Post: 23rd March 2015, 18:18
  2. Replies: 1
    Last Post: 16th November 2014, 20:14
  3. Replies: 3
    Last Post: 28th August 2014, 11:24
  4. France offers India 2 stop-gap Scorpene submarines
    By RajPatel in forum Indian Navy
    Replies: 0
    Last Post: 11th January 2014, 09:32
  5. Pakistan Navy ‘ever ready - combat ready’
    By Wattan in forum Pakistan Navy
    Replies: 3
    Last Post: 9th January 2014, 17:26

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Join us on twitter Follow us on twitter