    Will TKMS Pay Penalty For the Delays In Reis Class Construction Project?



    The German newspaper Handelsblatt run a story about the penalty to be paid by German submarine constructor Thyssen Krupp Marine Systems (TKMS) to Turkey. The reason for this payment is the delay in, construction of 6 Type 214 TN submarines Turkey as agreed to buy From TKMS in 2009.
    On 2 July 2009, a contract was signed between Turkey and Howaldtswerke-Deutsche Werft GmbH (HDW), Kiel, a company of TKMS, and MarineForce International LLP (MFI), London, for the delivery of six material packages for the construction of Class 214 submarines which are now called as the Reis class.
    The value of the contract is estimated as 2,5 billion €. There is %80 offset agreement. The submarines will be built in Gölcük Naval Shipyard where 11 submarines of Type 209, were previously built. According to the original contract terms the construction was to start in 2011, and the first sub delivered in 2015.
    The reasons for the delay of the construction is both technical and commercial.
    The technical delay is related to the much reported to the stability problems the Type 214 submarines experienced. The stability problem was one of the main reasons why Greek Navy refused to accept its first Type 214 HS Papanikolis years ago in the first place. The solution to the stability problem by TKMS was to add weights to certain places in the submarine in order to create a stability. But Turkish Navy was not satisfied with this come up with its own solution where the center of gravity of the submarine was relocated,by adding extending the length of the submarine. The solution has to be validated by TKMS and this is one of the delay in the project. This also means that Turkish Navy is working seriously in submarine design and problems associated with it. In the end Turkish Type 214 submarines will be a few meters longer than the other nations Type 214 submarines.
    The Type 214 construction project is the last project where Turkish Navy will construct a submarine to a foreign design and subsystems. It is not a secret that the next submarines constructed by Turkish Navy will be local design with most of the critical components ans sub systems produced with local input. It is not surprising to see the large Turkish industrial participation in the Type 214 project as this project is regarded as preparation phase for the Milli Denizaltı (Milden). Milli Denizaltı means National Submarine in Turkish. So it is understandable for the Germans to drag their feet in the Type 214 project especially when they know that this is the last of its kind.

    http://turkishnavy.net/
    The Following 2 Users Say Thank You to T-123456 For This Useful Post: manuu,Wattan


  2. #2
    Senior Member Wattan's Avatar
    Join Date
    Aug 2012
    Posts
    6,198
    Thanks
    2713
    Pakistan Pakistan

    Re: Will TKMS Pay Penalty For the Delays In Reis Class Construction Project?

    I suppose it will depend on the small print in the contract if a penalty is to be paid or not

Similar Threads

  1. Russia Begins Construction of New Anti-Missile Voronezh-class Radar
    By safriz in forum Global Military Developments
    Replies: 4
    Last Post: 13th August 2013, 11:58
  2. Construction of 147MW Patrind Hydro project begins in AJK
    By Felix in forum Economy & Development
    Replies: 1
    Last Post: 22nd July 2013, 21:32
  3. Replies: 0
    Last Post: 16th July 2013, 11:41
  4. After delays, US bunker-buster available
    By Greater China in forum U.S. Affairs
    Replies: 0
    Last Post: 26th July 2012, 19:41

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Join us on twitter Follow us on twitter